LINC 5 - Newnan Crossing Boulevard

 

The Newnan Crossing Blvd LINC will connect to the Newnan Centre Connection along the creek and extend to the existing side path along the east side of Newnan Crossing Blvd. The road currently has an asphalt walking path which will be widened to 10’ wide and improved to insure a safe buffer from the travel lanes of the road. The trail will provide spurs to the adjacent neighborhood and invite easy access to the LINC Trail System.

A trailhead is proposed along undeveloped private property off of Newnan Crossing Blvd. where the trail will leave the road and follow a creek to Shenandoah Blvd. The trail will cross at-grade to the east side of Shenandoah Blvd. with a rapid flashing beacon proposed for the crossing. This section will provide a neighborhood connection for all living in the neighborhoods off Shenandoah Blvd.